switek email

sales06@switek.biz

switek whatsapp

+86 186 5927 5869

IMLBucket
Project Details

# Name Value
1 Product Name IMLBucket
2 Material PP
3 Mould Cavities 1
4 Cycle Time 30
5 IML Robot SW850
6 IMM 700 Ton

IML Robot
# Name Value
1 In Mould Time 2.5~5 s
2 Dry Cycle Time 8 s
3 Power 7.2 (KVA)
4 Input Power AC220V/3P
5 Working Pressure 5~7
6 Air Consumption 10(NL/Cycle)
7 Net Weight 950 kg
8 Gross Weight 1500 kg

iml robot dimension
# Name Value
1 X1 190 mm
2 X2 190 mm
3 Y 500 mm
4 Z 2300 mm
5 L 2840 mm
6 W 2200 mm
7 A 1400 mm
8 B 2580 mm
9 H 1920 mm
IML Video

Why it's not recommended to have an IML solution with more than 4 cavities for containers which request a wrap+bottom labeling?

For an IML container which request a wrap + bottom labeling will need 2 labels and request a reverse injection technology. With two labels means that there would be 2 sets of magazines and mandrel to stock and pick the labels for the containers. A four cavities design of the mold there would be sufficient space in the IML robot to fit in the extra magazines, but for more cavities mold design the size of the magazine will exceed the limit of the IML robot and will reduce the efficiency of the robot. It would not be an ideal solutions for Wrap + Bottom IML Solutions


SWITEK Automation finished the in house testing of a turn-key 2 cavities lids side entry IML solution for the 500g sweat box for India market during the visiting of India customer for the final inspecting of the system.

IML containers are getting more and more popular especially the rectangular box with a capacity of 500g and 1kg for sweats in the holiday seaseon and is attracting more and more package producer to join the competing in this business. To provide the customer a ready to use IML system, SWITEK automation organized the co-testing with the mold before the delivery to ensure every parameter of the system will meet the demand of the customer to produce a perfect IML container.

Focused on the IML and IML + Vision + Packing Solutions, SWITEK have an independent laboratory workshop which has a P380 and the chiller system installed for the final testing of the IML system before delivery. With the whole system well tested before delivery, it'll fasten the speed up the final installation in the field and help the IML producer to get their investment back earlier.

Inquiry Now
Submit

WhatsApp

WeChat

E-mail: sales@switek.biz

CopyRight © HuangYanZheng