Keywords:IML Robot; IML Robot Operating; In Mold Labeling Robotics
Check List
| No. | Name | Function |
|---|---|---|
| (1) | Finish | When you have completed the maintenance item, click "Finish". |
| (2) | Save | After clicking "Finish" for multiple items, click "Save" to confirm. |
Oiling
After the refueling distance set in the mechanical parameters is reached, the system will prompt the user to do maintenance, and after the maintenance of each shaft, click "Refueling Completed" on the right side, and then click "Save", so as to update the last refueling day.
SW6310S-20
Unit: mm
| X1 | X2 | X3 | X4 | Y | YM1 | YM2 | Z | L | W | H | Payload | 980 | 820 | 0 | 0 | 1000 | 235 | 765 | 1580 | 2640 | 1500 | 1930 | 3kg |
|---|
EOAT Assembly Demonstration -- Two Cavities Parts Picking EOAT with Runner Gripping
Product Descriptions
Bom List
| Product Name | PN # | Model | Quantity |
|---|---|---|---|
| Quick Changer | 7.Y00175 | QCS-G100 | 1 |
| Sprue Gripper | 8.Y00050 | GR12-12CP | 1 |
| Plugs for Profile | 4.Y00069 | PEP2518 | 10 |
| Cross Mounting Bracket for Profiles | 7.Y00194 | SMBA-2525T | 6 |
| Extruded Profile | 4.Y00455 | PEP2518-1000 | 2 |
| Vacuum Cups VS2 Series | 1.Y03085 | VS2-SA11 | 6 |
| Vacuum Cup Fitting | 7.Y00703 | VM-02-G18 | 6 |
| Rotative Suspensions | 8.Y00061 | VFR1421-G18 | 6 |
| Mounting Bracket | 7.Y00200 | SMBE1-1440T | 6 |
| Connector | 1.Y02510 | APF-M5 | 2 |
| Side Manifold Block | 7.Y00157 | SMB-06M5 | 2 |
| L-Type Threaded HOse Fitting | 1.Y02722 | APL6-01 | 8 |
| Straight Threaded Hose Fitting | 1.Y02725 | APC6-01 | 6 |
What's Would be the Most Economic Way to Produce An IML Bucket With Handle?
As one of the most popular food package in the market, an IML pail with handle is in demand of huge quantity but the assembly of the handle make it a labour entensive products. Is there any solutions that will make the production of an IML bucket with handle automatically? The answer would definitely yes.
One of the most economic way would be to have the pails and handle integrated into one single mold, it could be 2 + 2 or 4 + 4 design which the IML robot will pick the buckets and have the handles assembled automatically. With this solution, the IML buckets producer will only need one set of IML system to have the buckets and handle produced and assembled immediately.
> It sounds great right, but what would be the productivity of such a system? In Chinaplas 2024 SWITEK cooperated with YIZUMI onshowed a 2 + 2 IML solution of 1L pails at the cycle time of around 7.5s. Generally the performance of the injection molding machine, the mold and the IML robot are all very important to make it a perfect IML system with handle assembly.
Fore more questions about your IML projects, please feel free to contact Adams from SWITEK, your personal consultant of IML technology.